24 Cores Monomodo Communication Cable De Fibra Optica ADSS
Description:
The fibers are positioned in a loose tube made of a high modulus plastic. The tubes are filled with a water-resistant filcompound. The tube is wrapped with a layer of Kevlar. Between the Kevlar yarn and the loose tube water-blockmaterial is applied to keep the cable compact and watertight. The cable is completed with a polyethylene (PE) sheath.
Characteristics:
1. Can be installed without shutting off the power
2. Light weight and small diameter reducing the load caused by ice and wind and the load on towers and backprops
3. Large span lengths and the largest span is over 1000m
4. Good performance of tensile strength and temperature
Application:
The actual status of overhead power lines is taken into full consideration when ADSS cable is being designed.
For overhead power lines under 110kV, PE outer sheath is applied. FOR power lines equal to or over 110kV, AT outer sheath is applied.
The dedicate design of aramid quantity and stranding process can satisfy the demand on various spans.
Technical Parameters:
Fiber |
|
G.652D |
G.655 |
50/125um |
62.5/125um |
Attenuation(+20ºC) |
@850nm |
|
|
≤3.0dB/km |
≤3.3dB/km |
@1300nm |
|
|
≤1.0dB/km |
≤1.0dB/km |
@1310nm |
≤0.36dB/km |
≤0.40dB/km |
|
|
@1550nm |
≤0.22dB/km |
≤0.23dB/km |
|
|
Bandwidth |
@850nm |
|
|
≥500MHz.km |
≥200MHz.km |
@1300nm |
|
|
≥500MHz.km |
≥500MHz.km |
Optical Characteristics: |
Fiber Sort |
Multimode |
G.651 |
A1a:50/125 |
Graded-index fiber |
A1b:62.5/125 |
Singlemode |
G.652(A,B,C) |
B1.1:Conventional fiber |
G.652D |
B2: Zero dispersion shifted |
G.655 |
B1.2 :Cut-off wavelength shifted |
G.657(A1,A2 ,B3) |
B4: Main technical data for positive
dispersion shifted single-mode fiber |
Why choose Takfly?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Delivery
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
Payment
Acceptable by T/T, West Union, PayPal and L/C according to your requirement
Shipping
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address are not supplier's responsibility.