Description:
Takfly series rackmounted patch panel is designed to manage and house easy-plug MTP / MPO to LC fiber cassette modules, for connecting plug-and-play pre-terminated high density MTP / MPO Fiber cabling system.This solution contributes to greater network availability that especially suitable for SAN, LAN and Data Center applications. Each easy-plug MTP / MPO to LC cassette is accommodated with a 12/24-fiber MTP / MPO based fiber assemblies, and pre-loaded with LC adapters in different fiber modes for your choices.
Features:
- Up to 4 Small/MTP modules in 1U
- Multiple adaptor options available
- Accepts loose tube, distribution and pre-terminated cables
- ROHS, REACH SvHC and ULrated
- Fits standard 19"
Applications:
- Data center
- Telecommunication networks
Specifications:
U Size |
1U (44.45mm) |
Number of Ports |
4 |
Width |
482mm |
Depth |
380mm |
Net Weight |
3kgs |
Packaged Weight |
3.3Kgs |
Material |
1.2mm Cold-rolled steel |
Material Coating |
Powder coating |
Color |
Black |
Designed in Accordance With |
TIA/EIA 568.C, ISO/IEC 11801, EN50173, IEC60304, IEC61754,EN297-1 |
Compliant to |
RoHS, Reach/SVHC |
Why choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Advantages
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 workers
7.Excellent service
Delivery
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
Payment
Acceptable by T/T, West Union, PayPal and L/C according to your requirement
Shipping
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address are not supplier's responsibility.
4.Please do not bid if you disagree with the shipping and handling charge.
Contact
1.Our working time:8:30am~5:30pm
2.All the inquiries will be replied within 24hours, So please feel free to send us your inquiry.
3.When our trade manager is off line, please feel free to leave a message, and tell us the products you need, our model number, and your E-mail address, we will reply to you within 24 hours too.
Any question about this MPO/MTP products, please leave me an inquiry or contact me directly.