3U 19" 19 inch MPO MTP Rack Mount Fiber Optic Patch Panel
Tags: MPO/MTP Patch Panel;MPO/MTP Rack
Intro:Takfly MPO/MTP Fiber Optic Patch Panel is used for trunk cable connection and distribution cable management in distribution area of MDA, IDA or HDA data centers. It could be installed in 19 inch racks and cabinets. It could accommodate MPO/MTP cassette modules or MPO/MTP adapter panels.
Application:
Machine rooms of data center and internet;
Data communication network;
Optical system access network;
Storage area networking fiber channel;
High density architectures
Feature:
Could install in 19 inch racks and cabinets, manage MPO/MTP cassette modules
Modular design realizes high port number and improves high density connection capabilities.
3U MPO/MTP Fiber Optic Patch Panel can accommodate 9pcs of MPO/MTP cassette modules.
Made of Cold-rolled steel or aluminum
RoHS compliant.
MPO/MTP Patch Panel includes cable management and labels.
Convenient installation and easy management.
Modular design is easy for upgrade and maintenance.
U Size |
1U(44.5mm) |
2U(89mm) |
3U(132mm) |
4U(176mm) |
Ports |
3 |
6 |
9 |
12 |
Width |
482mm |
Depth |
250mm |
270mm |
Net weight |
2.75kg |
3.80kg |
4.35kg |
6060kg |
Packaged weight |
3.05kg |
4.10kg |
4.70kg |
7.10kg |
Why Choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control:
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Advantages:
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 workers
7.Excellent service
Delivery:
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
Payment:
Acceptable by T/T, West Union, PayPal and L/C according to your requirement
Shipping:
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address are not supplier's responsibility.
4.Please do not bid if you disagree with the shipping and handling charge.
Contact:
1.Our working time:8:30am~5:30pm
2.All the inquiries will be replied within 24hours, So please feel free to send us your inquiry.
3.When our trade manager is off line, please feel free to leave a message, and tell us the products you need, our model number, and your E-mail address, we will reply to you within 24 hours too.
Any question about this item,please leave me an inquiry or contact me directly.