Multicores OS2/Om3/Om4/OM5 Fiber Optic MPO MTP Patch Cord
Description:
MTP/MPO Patch Cord with 8-96 cores, compatible for round cable or flat cable, Single mode and Multimode are available, male connector and female connector are available.
1. CABLE Quality Assurance System:
* Test Specifications for Bellcore GR-409-core
* Smoke density Purpose IEC-61034
* Halogen Acid Content IEC-754-1
* Flame Resistance IEC 60332-1, IEC 60332-3
* Conform to WEEE RoHS standard.
2. Fiber Type: Single-mode/Multi-mode
Fiber Count: 8-96 cores
Cable Type: Bare fiber/Flat/Round
3. Application:
* CATV
* Active dvice termination
*Telecommunication networks
* Metro
* Local Area Networks(LAN
* Data Processing networks
* Test Equipment
* Premise installations
* Wide Area Networks(WANs)
Fiber Optic Performance:
Item |
Parameter |
MPO/MTP Connector |
Standard SM |
Low Loss(Elite) SM |
Standard mm |
Low Loss mm |
Insertion Loss |
Typical |
0.35dB |
0.20dB |
0.35dB |
0.20dB |
Maximum |
0.75dB |
0.35dB |
0.60dB |
0.35dB |
Return Loss |
≥60 for APC (8 Angle Polish) |
≥20 for PC |
≥50 for PC |
-- |
Male/Female |
Male: With Pins, Female: Without Pins |
Tensile Strength |
≤0.3 (Max 66N) |
Vibration |
≤0.3 (10 ~ 55Hz) |
Thermal Cycle |
≤0.3 (-40 ~ 75ºC, 21Cycles) |
Why choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Advantages:
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 workers
7.Excellent service
Delivery:
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
Payment:
Acceptable by T/T, West Union, PayPal and L/C according to your requirement
Shipping
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address are not supplier's responsibility.
4.Please do not bid if you disagree with the shipping and handling charge.