Gold Member Since 2013
Audited Supplier
Takfly Communications Co., Ltd.

Joint Closure, Fiber Optic, Mechanical Sealing manufacturer / supplier in China, offering 48 Cores Vertical Dome Mechanical Sealing Fiber Optic Joint Closure, 19" Rack Mount 48/96/144 Cores Fiber Optic MPO Patch Panel, 1u Rack Mount Fiber Optic Sliding MPO/MTP Patch Panel and so on.

(/ )

Supplier Homepage Product Fiber Optic closure Splice closure/Joint closure 48 Cores Vertical Dome Mechanical Sealing Fiber Optic Joint Closure

48 Cores Vertical Dome Mechanical Sealing Fiber Optic Joint Closure

FOB Price: US $36-39 / Piece
Min. Order: 10 Pieces
Min. Order FOB Price
10 Pieces US $36-39/ Piece
Get Latest Price
Port: Shenzhen, China
Production Capacity: 10, 000/Week
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: TKS-M011
  • Wiring Devices: Fiber Optic Splice Closure
  • Condition: New
  • Model Number: Tks-M011
  • Payment Terms: Tt/Paypal/LC
  • Business Type: Manufacturer
  • Size: 480mm×220mm
  • Weight: 3500g-4100g
  • Transport Package: Inner Box+Carton
  • Origin: Shenzhen
  • Type: Optical Fiber Distribution Box
  • Certification: CE, ISO, RoHS, GS
  • Cores: 48 Cores
  • Customized: Available
  • Packing: 1PCS/Box, Several PCS in One Carton
  • Material: PC+ABS
  • Ports: 6
  • Trademark: TAKFLY/OEM/DF
  • Specification: 240 Cores Vertical Fiber Optic splice Closure
  • HS Code: 8542900000
Product Description
240 Cores Vertical Dome mechanical sealing  Fiber Optic Splice Closure

1. Scope of application
This Installation Manual suits for the Fiber Optic Splice Closure (Hereafter abbreviated as FOSC), as the guidance of proper installation.
 
The scope of application is: aerial, underground, wall-mounting, duct-mounting, handhole-mounting. The ambient temperature ranges from -40ºC to +65ºC.
2. Basic structure and configuration 
2.1 Dimension and capacity
Outside dimension (Height x Diameter)480mm×220mm
Weight (excluding outside box)3500g-4100 g
Number of inlet/out ports6 pieces
Diameter of fiber cableΦ8mm~Φ21mm
Capacity of FOSCBunchy:24-288 (cores), Ribbon: up to 432(cores)
 
2.2 Main components
No.Name of componentsQuantityUsageRemarks
1FOSC cover1 pieceProtecting fiber cable splices in wholeHeight x Diameter
400mm x 220mm
2Fiber optic splice tray (FOST)Max. 6 trays (either bunchy or ribbonFixing heat shrinkable protective sleeve and holding fibersSuitable for:
Bunchy: 24,36, 48, 72 (cores) 
Ribbon:12,18 (pieces)
3Base1setFixing internal and external structure 
4Fiber holding tray1 pcsHolding fiber with protective coat 
5Plastic hoop1 setFixing between FOSC cover and base 
6Gasket ring1 setBig gasket ring is used to seal FOSC cover and base.
Small gasket ring is used to seal entry/exit tube
1 piece of big gasket ring, 6 pieces of small gasket ring
7Pressure testing valve1 setAfter inject air, it is used for  pressure testing and sealing testingConfiguration as per requirement
8Earthing deriving device1 setDeriving metallic parts of fiber cables in FOSC for earthing connectionConfiguration as per requirement
2.3 Main accessories and special tools
No.Name of accessoriesQuantityUsageRemarks
1Heat shrinkable protective sleeve Protecting fiber splicesConfiguration as per capacity
2Nylon tie Fixing fiber with protective coatConfiguration as per capacity
3Earthing wire1 piecePutting through between earthing devices 
4Abrasive cloth1 pieceScratching fiber cables 
5Labeling paper1 pieceLabeling fibers 
6Special wrench2 piecesInstalling and tightening nut of reinforced core and nut (plastic) of  entry/exit tube 
7Measuring paper1 pieceTo measure perimeter of fiber cable, of which the diameter is enlarged with seal tape 
8Seal tape1 ringEnlarging diameter of fiber  cable which fits in with gasket ring.Configuration as per specification
9Insulation tape1 ringEnlarging diameter of fiber  cable for easy fixing 
10Metal hoop1 setFor wall mounting and pole hugging 
11Buffer tube
 
decided by customersHitched to fibers and fixed with FOST, managing buffer.Configuration as per requirement
12Desiccant1 bagPut into FOSC before sealing for desiccating air 
3. Necessary tools for installation
3.1 Supplementary materials (to be provided by operator)
Name of materialsUsage
Scotch tapeLabeling, temporarily fixing
Ethyl alcoholCleaning
GauzeCleaning
 
3.2 Special tools (to be provided by operator)
Name of toolsUsage
Fiber cutterCutting off fiber cable
Fiber stripperStrip off protective coat of fiber cable
Combo toolsAssembling FOSC
 
3.3 Universal tools(to be provided by operator)
Name of toolsUsage and specification
Band tapeMeasuring fiber cable
Pipe cutterCutting fiber cable
Electrical cutterTake off protective coat of fiber cable
Combination pliersCutting off reinforced core
ScrewdriverCrossing/Paralleling screwdriver
Scissor 
Waterproof coverWaterproof, dustproof
Metal wrenchTightening nut of reinforced core
 
3.4 Splicing and testing instruments (to be provided by operator)
Name of instrumentsUsage and specification
Fusion Splicing MachineFiber splicing
OT DRSplicing testing
Provisional splicing toolsProvisional testing
Notice: The above-mentioned tools and testing instruments should be provided by the operators themselves.
 
 
Application:
Aerial -hanger
Wall-mounting
Directly buried

Why choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
 
Quality Control
All products must go through five checks before manufacturing process
 
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
 
Advantage
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 workers
7.Excellent survice
 
Delivery:
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
 
Shipping 
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because  of wrong address are not supplier's responsibility.
4.Please do not bid if you disagree with the shipping and handling charge.
 
Contact
Name: Jessica Liao
Mob:+86-13502850422

Have a nice shipping time!
 
Send your message to this supplier
Avatar
Miss Jessica
Sales Manager
*From:
To: Miss Jessica
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now